DMA 40%: A Clear Handoff from Purchasing to Production

2026-11-12

Illustration of a tablet, quality records and a sealed sample in an industrial laboratory.
AI-generated conceptual illustration of sharing raw material information between purchasing, quality, and production.

China Amines Co., Limited

A shipment of dimethylamine 40% aqueous solution has arrived. Purchasing has the order confirmation, quality has the COA, and production needs to know when the material is available.

For customers coordinating supply with China Amines Co., Limited, a concise material handoff record helps connect these separate pieces of information.

Start with one agreed product description

Record the full product name, supplier grade, internal material code, and approved specification revision.

Identify the required concentration as a weight-based value. Manufacturer specifications for DMA 40% describe the aqueous grade and its assay requirements, providing the context needed to interpret batch results.

Keep the same description across purchasing, receiving, and production records.

Pass on the batch-specific information

A useful handoff record includes:

InformationPurpose
Supplier batch numberConnects material with supporting records
Accepted assaySupports batch-specific content calculations
Received net solution weightEstablishes the recorded product quantity
Inspection and release statusShows availability under the site procedure
Storage locationIdentifies where the material is held

Attach or link the relevant COA. Manufacturer documentation systems commonly retrieve certificates using lot or batch identifiers.

Keep quantity calculations identifiable

Separate solution weight from calculated contained DMA.

For example, 5,000 kg of solution at exactly 40.0% w/w contains 2,000 kg of DMA. Label the concentration basis and calculation clearly.

If production uses an accepted assay that differs from the nominal value, retain that input with the calculation. Any process adjustment should follow the responsible technical team’s approved instructions.

Make outstanding actions visible

Record missing documents, pending tests, or unresolved questions with an owner and expected update.

Distinguish physical arrival from quality release so production planning reflects the material’s current status. If a delivery date or accepted quantity changes, update the shared record and notify the affected teams.

Coordinate your next DMA 40% delivery

Send China Amines Co., Limited your approved specification, required net quantity, packaging preference, destination, and production need date.

Include the batch documentation and receiving information your team needs to prepare a clear handoff.

Inquiries: info@chinaamines.com

Technical references